Veteran Mission Control 3.x is the production veteran-benefits platform while the V4 web/Core and native migration trains advance through governed GitHub and validation gates.
VMC 3.x production preserved; V4 web train paused at RC24 UATDeployment checked
Veteran Mission Control 3.x remains the verified production baseline. V4 web work is intentionally paused under the current containment policy; draft PR #393 preserves the RC24 mobile-support UAT candidate and its Vercel UAT preview without authorizing production promotion.
Reviewed: Evidence:
Next focus: Hold the V3 production baseline and RC24 UAT evidence unchanged until the owner explicitly resumes VMC web development or authorizes a later release gate.
What it covers
Project highlights
VMC 3.0 production
Interactive 3D Body Explorer
Full Case and evidence workflows
DevOps delivery flow
Where the work is right now
Feed refreshed
V3 production is preserved; the RC24 V4 web UAT candidate is frozen under containment.
VMC 3.x remains the canonical production baseline. Draft PR #393 preserves the RC24 mobile-support UAT candidate without authorizing production promotion.
PendingCI + Gate C
Validation
Owner/UAT review is paused.
The UAT candidate is preserved and its preview is available, but no further validation or promotion is authorized until the owner explicitly resumes VMC web work.
Current work
Active and recent work items
2 tracked
VA / Vercel UATIn review
RC24 public-trust mobile-support UAT candidate
Frozen UAT candidate. Preserve for owner review; no production promotion is authorized.
Reference
PR #393
Branch
release/vmc-2026.10-rc24
Commit
a6721919
Updated
VA / productionReleased
VMC Phase 0 cost-hardening production baseline
Latest accepted main production baseline; V3 remains the public release while V4 is paused.
Commit
b8cd279c
Updated
Digital presence
Channel readiness
Channel readiness measures the verified public account, identity, and destination. Publisher operation is separate and never raises or lowers the channel-readiness score.
94%Overall Channel Readiness
Channels Fully Ready
5 / 6
Configured Channels
6
Open Blockers
0
Last Verified
Oct 11, 2026
Publisher operation
Feed connected
Current verified portfolio status is available.
FacebookVeteran Mission Control Ready
Channel readiness100%
3 of 3 applicable gates are verified complete.
Current public channel identity verified from Metricool brand settings on October 11, 2026. Publisher connection and publishing state are tracked separately.
Current public channel identity verified from Metricool brand settings on October 11, 2026. Publisher connection and publishing state are tracked separately.
Current public channel identity verified from Metricool brand settings on October 11, 2026. Publisher connection and publishing state are tracked separately.
Current public channel identity verified from Metricool brand settings on October 11, 2026. Publisher connection and publishing state are tracked separately.
Current public channel identity verified from Metricool brand settings on October 11, 2026. Publisher connection and publishing state are tracked separately.
The newsletter is in progress. It is not part of social-channel readiness.
Email / newsletter metrics
Publications
0
Handle / account
VMC Veteran Brief
Public URL
Not published
Publisher connection
Not configured
Publisher publishing state
None
Latest successful publication
None verified
Latest verified public post
None verified
Blocker / failure
None reported
Last verified
Unknown
Publisher feed
Feed connected
Account createdIn progress
Handle configuredNot applicable
Production link verifiedNot applicable
RedditA governance evaluation is required before this channel becomes applicable. Not applicable
Channel readinessExcluded
This channel is excluded from the applicable readiness calculation.
A governance evaluation is required before this channel becomes applicable.
Handle / account
Unknown
Public URL
Not published
Publisher connection
Unknown
Publisher publishing state
Unknown
Latest successful publication
None verified
Latest verified public post
None verified
Blocker / failure
Current verified portfolio status is available.
Last verified
Unknown
Publisher feed
Feed connected
Account createdNot applicable
Handle configuredNot applicable
Production link verifiedNot applicable
XThis channel remains excluded unless it is separately approved. Not applicable
Channel readinessExcluded
This channel is excluded from the applicable readiness calculation.
This channel remains excluded unless it is separately approved.
Handle / account
Unknown
Public URL
Not published
Publisher connection
Unknown
Publisher publishing state
Unknown
Latest successful publication
None verified
Latest verified public post
None verified
Blocker / failure
Current verified portfolio status is available.
Last verified
Unknown
Publisher feed
Feed connected
Account createdNot applicable
Handle configuredNot applicable
Production link verifiedNot applicable
Publisher execution
Campaign status
Campaign status
VMC Public Launch Wave 1
In progress
Destinations planned
9
Destinations published
4
Destinations failed / blocked
0
Start date
Not recorded
Latest activity
Oct 18, 2026
VMC Public Launch Wave 1 metrics
Publications
4
Sanitized public metrics
Publications
4
Operating boundaries
How this project is governed
Public discovery, source control, and release authority are separate controls. A hosted page does not automatically activate a product or authorize publishing.
Public viewPublic and protected
veteranmissioncontrol.com
Source controlGitHub governed source
Source posture is recorded independently from the lifecycle stage.
Release controlEligible for governed release intake
Eligible for governed release intake after project-manifest adoption; every social dispatch still requires Publisher review and authorization.