Project pages
Each main initiative gets a stable overview, recorded status, next focus, and approved launch destinations.
King Holdings brings distinct products into one clear portfolio: live platforms, active builds, and carefully considered ideas, with dated updates and a clear next focus.
Latest catalog review:
Lifecycle labels are recorded project states, not real-time uptime. A connected social feed does not make old evidence current or authorize a release.
Loading project filters...
Visitors can understand and navigate the portfolio without being given access to internal schedules, obligations, recovery information, or operating records.
Each main initiative gets a stable overview, recorded status, next focus, and approved launch destinations.
Review dates and release evidence are kept separate from social-feed connectivity. Unknown status stays visible.
The operating Control Center remains private, read-only, no-store, and excluded from search.
Search the main projects, narrow by lifecycle stage, then open a project to see its current delivery stage, active work, dated evidence, digital presence, and governed production path.
Veteran Mission Control 3.x is the production veteran-benefits platform while the V4 web/Core and native migration trains advance through governed GitHub and validation gates.
Veteran Mission Control 3.x remains the verified production baseline. V4 web work is intentionally paused under the current containment policy; draft PR #393 preserves the RC24 mobile-support UAT candidate and its Vercel UAT preview without authorizing production promotion.
Hold the V3 production baseline and RC24 UAT evidence unchanged until the owner explicitly resumes VMC web development or authorizes a later release gate.
Veteran Mission Control Music is an active veteran-centered music and outreach program with released and scheduled original songs distributed through VMC channels.
Still Standing Watch and The Mission Goes On remain released. The planned October 5, 2026 Safe and Steady at Home release window has passed, but this portfolio reconciliation does not have provider-receipt evidence sufficient to promote the third song to verified released status.
Preserve the three-song catalog and reconcile provider receipts or public-post evidence before changing Safe and Steady at Home from verification pending to released.
A historical-data and simulation workspace for ticket generation, draw tracking, strategy testing, and results analysis.
The September 30 3D Bubbler release remains the accepted production baseline. The latest main change gates browser acceptance explicitly and intentionally skipped Vercel deployment; no newer production promotion is recorded.
Keep the Bubbler baseline stable and continue acquisition/buildout work without reopening browser-heavy CI or a production release unless separately authorized.
The central public entry point for the King Holdings portfolio and the protected operating views used to manage it.
The public portfolio remains live. The latest main change isolates the portal workflow from Social Publisher to stop cross-application CI fan-out; Social Publisher remains a separate execution authority and this status refresh does not resume its builds or publishing operations.
Maintain the isolated portal/Social Publisher boundary and update portfolio status only through bounded, explicitly authorized releases.
A destination hub for the King Holdings beach property, local attractions, guest information, and future booking capabilities.
The public property site remains READY with the September availability and $1,100 rent update as the current release. No newer public release train is recorded; rental-manager work remains a separate protected operations stream.
Keep the public property site stable and do not couple protected rental-manager changes to the public release path.
A local-first family planning workspace for destinations, schedules, budgets, lodging, activities, and travel decisions.
The family-ready planner remains production READY. Main commit 8d21e1e0 removes legacy hosted-backend assumptions, reinforcing the local-first operating model and the portfolio-wide prohibition on Supabase dependencies.
Keep the October local-first baseline stable and require explicit authorization before any future hosted-backend or production-deployment change.
A governed, explainable platform for corporate intelligence, deterministic scoring, forward calibration, scenario analysis, and risk-aware decisions.
The governed ACI-IPS production baseline remains live on the last verified READY deployment. The latest main change disables automatic Dependabot PR generation and intentionally skips deployment; no active feature PR exists.
Keep the accepted analytics baseline and cost controls in place until a separately scoped analytics release is explicitly resumed.
A private, single-owner case intelligence workspace operating under the local-only model. Its case data and operating information stay outside the public portfolio.
The accepted main baseline remains v4.18.20. Draft PR #8 still carries the owner-only local data/no-login RC10 rebuild and has not replaced main; no new hosted promotion is authorized under the current containment policy.
Keep RC10 in draft/local review until the project is explicitly resumed, preserving the local-only model and keeping protected case data off hosted/public paths.
A Texas veteran business network connecting entrepreneurship resources, mentoring pathways, community participation, and a reviewed business registry.
TVEN production remains READY on main. The latest main change is CI hygiene, and draft PR #50 for new-business onboarding/social promotion remains unpromoted; Veteran Collabs is separately paused and does not authorize cross-project promotion.
Keep TVEN production stable and leave draft automation work unpromoted until an explicit release decision is made.